Computer File
The Effect of initial stress to 3D settlement analysis
Variety of methods have been proposed over decades in order to estimate pile group settlement. Due to the development of numerical tools, modelling settlement of pile group is no longer limited to the column load and pile geometry but also can be expanded to consider the effect of construction activities such as fill and excavation and non-horizontal surface geometry which affects initial stress prior to settlement analysis. In this paper, numerical simulation carried by using MIDAS GTS NX is conducted in order to evaluate the effect of construction activities and non-horizontal surface geometry to the settlement analysis.
Barcode | Tipe Koleksi | Nomor Panggil | Lokasi | Status | |
---|---|---|---|---|---|
maklhsc686 | DIG - FTS | Makalah | Perpustakaan | Tersedia namun tidak untuk dipinjamkan - No Loan |
Tidak tersedia versi lain